Data shown is for informational purposes only and does not constitute investment advice. TopFund is not SEBI-registered. Consult a SEBI-registered advisor before investing.
Oval Projects Engineering IPO
Price Band
₹80.0–85.0
Issue Size
₹46.74 Cr
Lot Size
1,600 shares
Min Investment
₹272,000
2 LOTS MIN
GMP
—
Issue Price
₹85.0
Oval Projects Engineering IPO AI Summary
- Oval Projects Engineering IPO is listed on BSE SME in the Civil Construction sector.
- Price band: ₹80.0–₹85.0 per share, lot size 1,600 shares (min. investment ₹272,000, 2 lots minimum).
- Subscription window: 28 Aug–01 Sep 2025, listing on 04 Sep 2025.
Oval Projects Engineering Limited is an infrastructure development company focused on the Oil & Gas sector and has shown consistent revenue and profit growth over the past few years. With a strong management team and a robust order book, the company is positioned for future growth. Investors should consider their risk profile and investment strategy when evaluating this IPO.
TopFund is not SEBI-registered — this is educational analysis, not personalized investment advice.
Oval Projects Engineering IPO — Third-Party Research Views
Reviews below reflect analyst calls made before this IPO closed on 01 Sep 2025 — not a current signal.
Recommendations are sourced from third-party research firms and are not TopFund's own investment advice.
Important Dates
Subscription Status
Subscription data unavailable
Oval Projects Engineering IPO Grey Market Premium (GMP) Today
GMP not available yet
Grey Market Premium is updated daily. Check back closer to the listing date.
About the Company
Incorporated in 2013, Oval Projects Engineering Limited is an infrastructure development company specializing in the Oil & Gas, City Gas Distribution, Urban Development, and Energy sectors across India. The company specializes in upstream, midstream, and downstream activities in the Oil and Gas sector, including pipeline laying, processing plants, CGS work, and O&M services for power plants and EPC projects. The company offers turnkey solutions spanning upstream, midstream, and downstream segments, with a strong presence in regions like Agartala, Tripura, and various other locations nationwide. The company has successfully executed over 900 km of pipeline installations and continues to engage in diverse projects within the Oil &; Gas and Power sectors. Business Segment: Oil & Gas Infrastructure: The company's Oil & Gas Infrastructure vertical focuses on designing and executing gas processing plants, oil/petrochemical storage terminals, pipeline laying, and developing infrastructure for distribution. Oil and Gas Operation and Maintenance: The company provides O&M services to CGD companies and public sector entities, including pipeline repairs, maintenance, scheduled shutdowns, and management of gas genset power plants and CNG stations. Special Infrastructure projects: The company gained expertise in civil infrastructure during oil and gas plant projects, executing specialized works. It now handles technical infrastructure projects funded by the government, World Bank, and ADB. As of March 31, 2025, the company had 123 on-roll employees. Competitive Strength: Strong Project execution capabilities Experienced Promoter and Management Team Optimal Utilization of Resources Visible growth through a robust order book Leveraging the market skills and relationship
Company Financials (₹ Cr)
As of 2025-03-31
| Period Ended | 31 Mar 2025 | 31 Mar 2024 | 31 Mar 2023 |
|---|---|---|---|
| Assets | 156.23 | 103.80 | 82.25 |
| Total Income | 103.44 | 78.99 | 64.09 |
| Profit After Tax | 9.33 | 4.40 | 3.19 |
| EBITDA | 18.08 | 9.89 | 3.46 |
| NET Worth | 55.88 | 33.67 | 17.75 |
| Reserves and Surplus | 40.61 | 20.00 | 17.68 |
| Total Borrowing | 53.70 | 32.41 | 32.21 |
Key Ratios
EPS
₹6.11
NAV
₹31.89
ROE
20.85%
ROCE
21.32%
RoNW
20.85%
P/B Value
2.67
P/E Ratio
13.91
Market Cap
₹176.54 Cr
PAT Margin
9.12%
Peer Comparison
| Company | NAV | RoNW | P/E (x) | EPS Basic |
|---|---|---|---|---|
| Konstelec Engineers Limited | 20.3 | 4.93% | 19.39 | 3.14 |
| Likhitha Infrastructure Limited | 5.4 | 18.52% | 15.34 | 17.57 |
| Oval Projects Engineering Limited This IPO | 31.89 | 20.85% | — | 6.65 |
Promoters
Goutam Debnath
Objects of the Issue
The Company proposes to utilise the Net Proceeds from the Issue towards the following objects: # Issue Objects Est Amt (₹ Cr.) 1 Utilization towards long-term working capital requirements of the Company 37.03 2 General Corporate Purposes 3.94 3 Issue Expenses 5.78 Total 46.74
IPO Evaluation
Generated 23 Sep 2026Revenue Trend
Total Income was ₹64.09 Cr in the period ending 31 Mar 2023, increasing to ₹78.99 Cr by 31 Mar 2024, and further rising to ₹103.44 Cr by 31 Mar 2025. This shows a consistent growth in revenue over the periods.
Profit Trend
Profit After Tax was ₹3.19 Cr in the period ending 31 Mar 2023, which grew to ₹4.40 Cr by 31 Mar 2024, and reached ₹9.33 Cr by 31 Mar 2025. This indicates a significant increase in profitability over the reported periods.
Valuation
The company has an EPS of ₹6.65 and is priced at a P/E ratio of 13.91. Comparatively, peers like Konstelec Engineers Limited and Likhitha Infrastructure Limited have P/E ratios of 19.39 and 15.34, respectively. This suggests that Oval Projects Engineering is priced at a lower multiple compared to its peers.
Grey Market Premium, Explained
The grey market refers to the unofficial trading of shares before they are listed on the stock exchange. It provides an indication of the expected demand for an IPO. A positive grey market premium (GMP) suggests that the shares may list at a higher price than the issue price, while a negative GMP indicates the opposite. However, trading in the grey market is unregulated and carries risks.
Who This IPO Suits
Investors comfortable with short-term volatility and a long-term horizon typically weigh IPOs like this against the company's fundamentals, market conditions, and potential sector growth. It's important to consider the company's financial health and growth prospects before making a decision.
Who May Want to Wait
Investors who prefer stable returns and are risk-averse may want to avoid IPOs in sectors that are subject to significant fluctuations or uncertainties. It's advisable to assess one's risk tolerance and investment strategy.
IPO Timeline, Explained
The IPO opens for subscription on 28 August 2025 and closes on 1 September 2025. Allotment of shares will be done on 2 September 2025, with the listing of shares expected on 4 September 2025.
Listing Gains — The Risk
Listing gains refer to the profit made by investors when shares are listed at a price higher than the issue price. However, these gains are not guaranteed and can be influenced by market conditions, investor sentiment, and the company's performance post-listing. Investors should be prepared for the possibility of price fluctuations on the listing day.
This evaluation is generated from Oval Projects Engineering's own public IPO filing data for educational purposes and is not investment advice or a recommendation to apply, subscribe to, or avoid this issue — see Broker Recommendations below for named third-party research views (clearly attributed, not TopFund's own). TopFund is not a SEBI-registered investment adviser — see our Disclaimer.
Frequently Asked Questions
What is the price band of Oval Projects Engineering IPO?
The price band of Oval Projects Engineering IPO is ₹80.0–₹85.0 per share.
When does Oval Projects Engineering IPO open and close?
Oval Projects Engineering IPO opens on 28 August 2025 and closes on 01 September 2025.
When does Oval Projects Engineering IPO list on the stock exchange?
Oval Projects Engineering IPO listed on 04 September 2025 at ₹85.0.
What is the lot size for Oval Projects Engineering IPO?
The lot size for Oval Projects Engineering IPO is 1600 shares, requiring a minimum investment of ₹272,000 (2 lots).
What is the lot size for this IPO?
The lot size for the Oval Projects Engineering IPO is 1600 shares.
What is the minimum investment required?
The minimum investment required is ₹2,72,000.
What is the price band for this IPO?
The price band for the IPO is ₹80.0 to ₹85.0.
When does the IPO open and close?
The IPO opens on 28 August 2025 and closes on 1 September 2025.
What does GMP mean?
GMP stands for Grey Market Premium, which indicates the expected demand for the IPO shares before they are officially listed.
Issue Details
Investor Allocation
Registrar
Lead Managers / Book Running
IPO Timeline
Open
28 Aug 2025
Close
01 Sep 2025
Allotment
02 Sep 2025
Listing
04 Sep 2025
Similar IPOs in Civil Construction
Plan Your IPO Investment
Related Articles
Community Sentiment
What are other investors planning for Oval Projects Engineering?
No votes yet — be the first to share your view.
Sign in to voteDiscussion
User-generated content — not investment advice, and not verified or endorsed by TopFund.
No comments yet — start the discussion.