Data shown is for informational purposes only and does not constitute investment advice. TopFund is not SEBI-registered. Consult a SEBI-registered advisor before investing.

GR

GRE Renew Enertech IPO

Listed SME BSE SME · Civil Construction

Price Band

₹100.0–105.0

Issue Size

₹39.56 Cr

Lot Size

1,200 shares

Min Investment

₹252,000

2 LOTS MIN

GMP

Grey Market Premium — the unofficial premium buyers are currently willing to pay over the issue price once this IPO lists. It's an informal market estimate, not guaranteed, and can move daily right up to listing day. Learn more: GMP vs Kostak vs Sauda →

+₹1.0 (0.95%)

Issue Price

₹105.0

GRE Renew Enertech IPO AI Summary

  • GRE Renew Enertech IPO is listed on BSE SME in the Civil Construction sector.
  • Price band: ₹100.0–₹105.0 per share, lot size 1,200 shares (min. investment ₹252,000, 2 lots minimum).
  • Subscription window: 13 Jan–16 Jan 2026, listing on 21 Jan 2026.
  • Current GMP is +₹1.0 (0.95%), an estimated listing price of ₹106 — unofficial and can change daily.

TopFund is not SEBI-registered — this is educational analysis, not personalized investment advice.

Important Dates

IPO Open Date
Tue, 13 Jan 2026
IPO Close Date
Fri, 16 Jan 2026
Allotment Date
Mon, 19 Jan 2026
Refund Initiation
Tue, 20 Jan 2026
Credit of Shares
Tue, 20 Jan 2026
Listing Date
Wed, 21 Jan 2026
Listing Price
₹106.0 +0.95%

Subscription Status

Subscription data unavailable

GRE Renew Enertech IPO Grey Market Premium (GMP) Today

GMP

+₹1.0

GMP %

+0.95%

Est. Listing

₹106.0

Updated: 14 Jul 2026 15:53

About the Company

GRE Renew Enertech Limited is engaged in the business of solar energy solutions and LED lighting products. They offer rooftop and ground-mounted solar installations, as well as indoor and outdoor LED lighting solutions. The company, originally a manufacturer of LED lighting solutions, now primarily focuses on solar energy. Business Model: CAPEX Model (EPC) (Engineering, Procurement and Construction): The company follows the CAPEX model, where consumers own and fund solar systems, while EPC services manage engineering, procurement, construction, and commissioning, ensuring complete PV plant delivery and grid connection. RESCO Model (Opex): The company uses the RESCO model, where it funds and owns rooftop solar systems, earning annuity income while consumers pay monthly tariffs, though securing low-cost capital remains a key challenge. Products and services: EPC (Engineering, Procurement, and Construction):Turnkey solar solutions from design to commissioning, including operation and maintenance as required. Rooftop Systems (On-Grid):Grid-tied solar systems reduce electricity bills by supplying power and feeding excess to the grid. Solar Rooftop Systems (Hybrid):Combines solar panels, batteries, and grid access to ensure a continuous, eco-friendly power supply anytime. PV Module:High-efficiency, reliable solar modules suitable for various applications with strong performance in all conditions. Competitive Strengths: Experience Management Team Training and Skill development programs to strengthen Operation & Maintenance Team Existing number, visible order book, and favourable national policy support 24/7 Premium Support System ESG (Environment, Social and Governance)

Company Financials (₹ Cr)

As of 2025-09-30

Period Ended 30 Sep 2025 31 Mar 2025 31 Mar 2024 31 Mar 2023
Assets 42.77 45.46 49.12 51.65
Total Income 43.98 84.37 92.15 53.11
Profit After Tax 4.00 7.03 9.91 0.89
EBITDA 5.72 9.48 11.48 1.31
NET Worth 35.22 31.23 21.03 11.14
Reserves and Surplus 24.70 20.71 19.78 9.89
Total Borrowing 1.45 1.59 4.57 4.75

Key Ratios

EPS

₹6.68

NAV

₹29.68

ROE

26.89%

ROCE

29.60%

RoNW

26.89%

P/B Value

3.54

P/E Ratio

15.72

Market Cap

₹150.02 Cr

PAT Margin

8.39%

Debt/Equity

0.05

Promoters

Kamleshkumar Dahyalal Patel, Kirtikumar Kantilal Suthar and Mukeshkumar Prahladbhai Trivedi

Objects of the Issue

The Company proposes to utilise the Net Proceeds from the Issue towards the following objects: # Issue Objects Est Amt (₹ Cr.) 1 Setting up of 7.20 MW (AC) / 9.99 MW (DC) Ground Mounted Solar Power Plant 31.58 2 General Corporate Purposes 3.65 3 Issue Expenses 4.34 Total 39.56

IPO Evaluation

Generated 23 Sep 2026

Revenue Trend

Total income was ₹53.11 Cr in the year ending 31 Mar 2023, rising to ₹92.15 Cr by 31 Mar 2024, then decreasing to ₹84.37 Cr by 31 Mar 2025. The most recent figure of ₹43.98 Cr as of 30 Sep 2025 is lower than the prior full year, though this is a 9-month figure, not a full year, so isn't directly comparable.

Profit Trend

Profit after tax was ₹0.89 Cr in the year ending 31 Mar 2023, increasing to ₹9.91 Cr by 31 Mar 2024. This continued to rise to ₹7.03 Cr by 31 Mar 2025, but then decreased to ₹4.00 Cr as of 30 Sep 2025, which is again a 9-month figure and not directly comparable to the full years.

Valuation

The company's implied P/E ratio at the issue price of ₹105.0 is 15.72, which is within the range of its peers.

Grey Market Premium, Explained

The grey market premium (GMP) refers to the unofficial price at which shares of an IPO are traded before they are listed on the stock exchange. A positive GMP indicates that the market expects the stock to perform well post-listing.

Who This IPO Suits

Investors comfortable with short-term volatility and a long-term horizon typically weigh IPOs like this against their investment goals and risk tolerance. It's important to consider the company's business model, financial performance, and market conditions before making a decision.

Who May Want to Wait

Investors who prefer stable, established companies with predictable earnings may want to avoid this IPO, as it operates in a sector that can be subject to regulatory changes and market fluctuations.

IPO Timeline, Explained

The IPO will open for subscription on January 13, 2026, and close on January 16, 2026. Allotment of shares will be done on January 19, 2026, with the listing date set for January 21, 2026.

Listing Gains — The Risk

Listing-day gains can be unpredictable and are influenced by various factors, including market sentiment and demand for the stock. Investors should be cautious, as there is a risk of price volatility on the listing day.

This evaluation is generated from GRE Renew Enertech's own public IPO filing data for educational purposes and is not investment advice or a recommendation to apply, subscribe to, or avoid this issue — see Broker Recommendations below for named third-party research views (clearly attributed, not TopFund's own). TopFund is not a SEBI-registered investment adviser — see our Disclaimer.

Frequently Asked Questions

What is GRE Renew Enertech IPO GMP today?

GRE Renew Enertech IPO GMP today is +₹1.0 (0.95%), indicating an estimated listing price of ₹106. GMP is an unofficial grey-market indicator and can change daily.

What is the price band of GRE Renew Enertech IPO?

The price band of GRE Renew Enertech IPO is ₹100.0–₹105.0 per share.

When does GRE Renew Enertech IPO open and close?

GRE Renew Enertech IPO opens on 13 January 2026 and closes on 16 January 2026.

When does GRE Renew Enertech IPO list on the stock exchange?

GRE Renew Enertech IPO listed on 21 January 2026 at ₹106.0.

What is the lot size for GRE Renew Enertech IPO?

The lot size for GRE Renew Enertech IPO is 1200 shares, requiring a minimum investment of ₹252,000 (2 lots).

What is the price band for the GRE Renew Enertech IPO?

The price band for the GRE Renew Enertech IPO is ₹100.0 to ₹105.0.

What is the minimum investment required?

The minimum investment required is ₹252,000, which corresponds to a lot size of 1200 shares.

When does the GRE Renew Enertech IPO open and close?

The IPO opens on January 13, 2026, and closes on January 16, 2026.

What does GMP mean?

GMP stands for grey market premium, which indicates the expected price of the stock in the grey market before it officially lists.

When will the shares be listed?

The shares are expected to be listed on January 21, 2026.

Issue Details

Issue Type SME Book Built
Issue Size ₹39.56 Cr
Price Band ₹100.0 – ₹105.0
Issue Price ₹105.0
Lot Size 1,200 shares
Min Investment ₹252,000 (2 lots minimum)
Exchange BSE SME
Sector Civil Construction
Open Date 13 Jan 2026
Close Date 16 Jan 2026
Allotment 19 Jan 2026
Listing Date 21 Jan 2026

Investor Allocation

QIB (Institutional) 50%
NII / HNI 15%
Retail (RII) 35%

Registrar

Maashitla Securities Pvt.Ltd.

Lead Managers / Book Running

Share India Capital Services Pvt.Ltd.

IPO Timeline

Open

13 Jan 2026

Close

16 Jan 2026

Allotment

19 Jan 2026

Listing

21 Jan 2026

Community Sentiment

What are other investors planning for GRE Renew Enertech?

No votes yet — be the first to share your view.

Sign in to vote

Discussion

User-generated content — not investment advice, and not verified or endorsed by TopFund.

No comments yet — start the discussion.