Data shown is for informational purposes only and does not constitute investment advice. TopFund is not SEBI-registered. Consult a SEBI-registered advisor before investing.
Afcons Infrastructure IPO
Price Band
₹440.0–463.0
Issue Size
₹5430.0 Cr
Lot Size
32 shares
Min Investment
₹14,816
GMP
+₹15.0 (3.24%)
Issue Price
₹463.0
Subject to Sauda
₹400
Paid only if allotted
Afcons Infrastructure IPO AI Summary
- Afcons Infrastructure IPO is listed on BSE, NSE in the Civil Construction sector.
- Price band: ₹440.0–₹463.0 per share, lot size 32 shares (min. investment ₹14,816).
- Subscription window: 25 Oct–29 Oct 2024, listing on 04 Nov 2024.
- Current GMP is +₹15.0 (3.24%), an estimated listing price of ₹478 — unofficial and can change daily.
Afcons Infrastructure Limited is a well-established player in the civil construction sector with a significant project portfolio and a diversified business model. The company is looking to raise funds through its IPO, which opens on October 25, 2024. Investors should consider the company's financial performance, market conditions, and their own investment strategy before participating.
TopFund is not SEBI-registered — this is educational analysis, not personalized investment advice.
Afcons Infrastructure IPO — Third-Party Research Views
Reviews below reflect analyst calls made before this IPO closed on 29 Oct 2024 — not a current signal.
12 of 20 reviewers say Positive
Recommendations are sourced from third-party research firms and are not TopFund's own investment advice.
Important Dates
Subscription Status
Subscription data unavailable
Afcons Infrastructure IPO Grey Market Premium (GMP) Today
GMP
+₹15.0
GMP %
+3.24%
Est. Listing
₹478.0
Updated: 25 Jul 2026 14:03
About the Company
Incorporated in 1959, Afcons Infrastructure Limited is an infrastructure engineering and construction company of the Shapoorji Pallonji group, with a legacy of over six decades. As of September 30 2023, the company has completed 76 projects across 15 countries with a total historic executed contract value of Rs 522.20 billion. As of September 30, 2023, the company has 67 active projects across 13 countries, totaling an order book of Rs 348.88 billion. The company is globally present in Asia, Africa and Middle East. The company has five major infrastructure business verticals Marine and industrial projects include covering ports, harbor jetties, dry docks, wet basins, breakwaters, outfall and intake structures, liquefied natural gas tanks, and material handling systems. Surface transport projects cover highways, roads, interchanges, mining-related infrastructure, and railways. Urban infrastructure projects include elevated and underground metro works, bridges, flyovers, and elevated corridors. Hydro and underground projects cover dams, barrages, tunnels (including large road tunnels), and underground works, water, and irrigation. Oil and gas projects cover both offshore and onshore oil and gas projects. Competitive Strength Strong Track Record of Timely Execution of Large-Scale, Complex and High-Value Projects Diversified Order Book across Geographies, Clients, and Business Verticals, Longstanding Relationships with Clients Globally, and Strong Financial Performance. Collaboration among internal teams, JV counterparties, and a strategic equipment base, leading to strong execution capabilities.
Company Financials (₹ Cr)
As of 2024-06-30
| Period Ended | 30 Jun 2024 | 31 Mar 2024 | 31 Mar 2023 | 31 Mar 2022 |
|---|---|---|---|---|
| Assets | 17,184.58 | 16,233.64 | 14,301.25 | 12,973.77 |
| Total Income | 3,213.47 | 13,646.88 | 12,844.09 | 11,269.55 |
| Profit After Tax | 91.59 | 449.76 | 410.86 | 357.61 |
| NET Worth | 3,662.25 | 3,575.05 | 3,155.06 | 2,691.03 |
| Reserves and Surplus | 3,342.52 | 3,255.22 | 2,653.75 | 2,190.11 |
| Total Borrowing | 3,365.10 | 2,455.00 | 1,562.82 | 1,555.20 |
Key Ratios
EPS
₹13.20
NAV
₹107.48
ROE
10.55%
ROCE
14.89%
RoNW
2.50%
P/B Value
4.31
P/E Ratio
35.08
Market Cap
₹17026.18 Cr
PAT Margin
2.85%
Debt/Equity
0.91
Peer Comparison
| Company | NAV | RoNW | P/E (x) | EPS Basic | EPS Diluted |
|---|---|---|---|---|---|
| Dilip Buildcon Ltd | 298.85 | 4.44% | 37.63 | 13.75 | 13.36 |
| Kalpataru Projects International Limited | 308.36 | 10.17% | 42.2 | 31.37 | 31.37 |
| Kec International Ltd.` | 155.32 | 8.68% | 74.67 | 13.49 | 13.49 |
| Larsen & Toubro Ltd. | 623.15 | 15.24% | 37.14 | 93.96 | 93.88 |
| Afcons Infrastructure Limited This IPO | 92.59 | 12.58% | — | 13.2 | 13.2 |
Promoters
Goswami Infratech Pvt.Ltd., Shapoorji Pallonji & Co.Pvt.Ltd. and Floreat Investments Pvt.Ltd.
IPO Evaluation
Generated 23 Sep 2026Revenue Trend
Total income was ₹11,269.55 Cr in the year ending 31 Mar 2022, rising to ₹12,844.09 Cr by 31 Mar 2023, and further increasing to ₹13,646.88 Cr for the year ending 31 Mar 2024. However, for the period ending 30 Jun 2024, total income dropped to ₹3,213.47 Cr, though this is a 3-month figure, not a full year, so isn't directly comparable.
Profit Trend
Profit after tax was ₹357.61 Cr in the year ending 31 Mar 2022, increasing to ₹410.86 Cr by 31 Mar 2023, and further rising to ₹449.76 Cr for the year ending 31 Mar 2024. For the period ending 30 Jun 2024, profit after tax decreased to ₹91.59 Cr, though this is a 3-month figure, not a full year, so isn't directly comparable.
Valuation
Afcons Infrastructure's implied P/E at the issue price of ₹463.0 is approximately 35.08, compared to peers trading at a P/E range of 37.14 to 74.67.
Grey Market Premium, Explained
The grey market premium (GMP) indicates the expected premium or discount at which an IPO might list on the stock exchange compared to its issue price. A positive GMP suggests that the market anticipates a higher listing price than the issue price, while a negative GMP indicates the opposite.
Who This IPO Suits
Investors comfortable with short-term volatility and a long-term horizon typically weigh IPOs like this against their overall investment strategy, considering factors such as market conditions and the company's growth potential.
Who May Want to Wait
Investors with a low risk tolerance or those seeking immediate returns may want to avoid IPOs like this, as they can be subject to market fluctuations and may not provide quick gains.
IPO Timeline, Explained
The IPO opens for subscription on October 25, 2024, and closes on October 29, 2024. Allotment of shares will be done on October 30, 2024, and the listing date is set for November 4, 2024.
Listing Gains — The Risk
Listing-day gains can be unpredictable and are influenced by market sentiment, demand for the stock, and overall market conditions. Investors should be aware that while some IPOs may list at a premium, others may not perform as expected.
This evaluation is generated from Afcons Infrastructure's own public IPO filing data for educational purposes and is not investment advice or a recommendation to apply, subscribe to, or avoid this issue — see Broker Recommendations below for named third-party research views (clearly attributed, not TopFund's own). TopFund is not a SEBI-registered investment adviser — see our Disclaimer.
Frequently Asked Questions
What is Afcons Infrastructure IPO GMP today?
Afcons Infrastructure IPO GMP today is +₹15.0 (3.24%), indicating an estimated listing price of ₹478. GMP is an unofficial grey-market indicator and can change daily.
What is the price band of Afcons Infrastructure IPO?
The price band of Afcons Infrastructure IPO is ₹440.0–₹463.0 per share.
When does Afcons Infrastructure IPO open and close?
Afcons Infrastructure IPO opens on 25 October 2024 and closes on 29 October 2024.
When does Afcons Infrastructure IPO list on the stock exchange?
Afcons Infrastructure IPO listed on 04 November 2024 at ₹478.0.
What is the lot size for Afcons Infrastructure IPO?
The lot size for Afcons Infrastructure IPO is 32 shares, requiring a minimum investment of ₹14,816.
What is the price band for the Afcons Infrastructure IPO?
The price band for the Afcons Infrastructure IPO is ₹440.0 to ₹463.0.
What is the minimum investment required?
The minimum investment required is ₹14,816.0.
What is the lot size for the IPO?
The lot size for the Afcons Infrastructure IPO is 32 shares.
When does the IPO open and close?
The IPO opens on October 25, 2024, and closes on October 29, 2024.
What does GMP mean?
GMP stands for grey market premium, which indicates the expected premium or discount at which an IPO might list compared to its issue price.
Issue Details
Investor Allocation
Registrar
Lead Managers / Book Running
IPO Timeline
Open
25 Oct 2024
Close
29 Oct 2024
Allotment
30 Oct 2024
Listing
04 Nov 2024
Similar IPOs in Civil Construction
Plan Your IPO Investment
Related Articles
Community Sentiment
What are other investors planning for Afcons Infrastructure?
No votes yet — be the first to share your view.
Sign in to voteDiscussion
User-generated content — not investment advice, and not verified or endorsed by TopFund.
No comments yet — start the discussion.